When McHugh Service’s came to us with a quick time-framed job, we jumped at the chance. A quick turn-around with quality products was the key to making this project successful.
“MKT provided excellent Round, Welded Ductwork in a short time frame for a large, Food Distribution Center located in Lehigh Valley, PA. We actually found out about the project on a Thursday, went to MKT on a Monday and 2 weeks after that, the duct work was installed. We used a Barrel Clamp AccuFlange System that worked out great. The Food Distribution Center was changing their procedures inside needing a mechanical renovation. All ductwork installed was new”, states Brian Alderfer, Project Engineer for McHugh Services.
MKT delivered over 61,000 pounds of ductwork in 2 weeks, equaling 1,703 feet of ductwork on the roof.
“We appreciate the exceptional effort MKT provides. They continually deliver excellent products and services to us.”~ Brian Alderfer, Project Engineer McHugh Services